Tuesday, June 11, 2013

Day 2 of Drywall

The contractor was anxious to get started on the fun part, and arrived at my house before 8 am this morning. Drywall is his specialty and he has a passion for it. He is very meticulous and wants the drywall to look perfect. The waterproof drywall was tacked up yesterday, and the room took on its final form. Although I didn't want to replace any of the ceiling drywall if possible, we may replace one sheet over top of the shower. There was already a lot of holes in the ceiling from the old light and fan, so it may be quicker and fewer joints if we just replace the entire piece.

Picked out the tile today.  It has a multi-colored marbled veins for the look that I wanted, but made of porcelain for the low maintenance care and cleaning that I needed.














No comments:

Post a Comment